Process & Quality·7 min read

How Custom Glass Is Priced, Made and Shipped: From RFQ to Crate

What actually happens between sending your drawings and a crate arriving at the port? A transparent look at pricing drivers, production stages, quality checks and export packing.

How Custom Glass Is Priced, Made and Shipped: From RFQ to Crate
Key Takeaways
  • Custom glass pricing rides on five variables: build-up, sheet yield, processing, coatings and volume.
  • A complete RFQ gets a firm itemized price in 24 hours; a vague one gets a guess.
  • Sheet yield is the biggest silent cost lever — ask for an optimization pass before locking panel dimensions.
  • Packing is engineering, not an afterthought: more glass dies in transit than in production.
  • Tolerances, certificates and packing photos belong in the order documents, not in the claims conversation afterwards.

Step One: The RFQ That Gets an Accurate Answer

Custom glass pricing is driven by five variables: glass type and build-up, dimensions (sheet yield — how many panels fit a stock sheet), processing (holes, notches, edges, tempering), coatings or printing, and volume. A request-for-quote that states all five gets a firm price in 24 hours; a vague one gets a guess. The fastest format: a drawing or spreadsheet with quantities, sizes, glass build-up, edge treatment and destination port.

What Moves the Price (and What Doesn't)

  • Sheet yield dominates: a panel sized to cut 6-per-sheet instead of 4 can drop unit cost 30% — worth asking before locking dimensions.
  • Processing adds real steps: each hole, notch and special edge is machine time and quality-check time.
  • Tempering, lamination and IGU assembly each carry fixed line costs — small quantities price higher per m², not because glass is dearer but because setup is.
  • Volume discounts step at crate-fill quantities, because freight, not production, becomes the limiter.
  • Brand-name glass (e.g. imported coatings) costs more than equal-performance generic — performance data, not labels, should decide.
  • Drawing format matters more than buyers expect: a clean DXF or dimensioned PDF prices faster and cuts fewer arguments than a photo of a napkin sketch with numbers beside it.

Production: What Happens on the Line

Cutting from stock sheets, then edgework (polish/bevel), CNC holes and notches, and any printing or coating — all before heat treatment. Tempering or bending comes next, then lamination and IGU assembly, then inspection and heat-soak where specified. Each stage has its own tolerance check; panels that fail any stage are recycled, not shipped. Our capabilities page details the equipment behind each step.

The IGU line: washing, spacer bending, pressing and sealing — each stage a cost driver your RFQ should acknowledge.
The IGU line: washing, spacer bending, pressing and sealing — each stage a cost driver your RFQ should acknowledge.

Quality Checks That Protect the Project

  • Dimensional inspection per batch, with reports available per shipment.
  • Tempering verification (fragmentation tests) and heat-soak certificates where ordered.
  • Print and coating color checks against approved samples.
  • Cross-section photos for IGU builds (spacer, seals, gas fill) on request.
  • Physical samples before production for any new build-up — cheap insurance on large orders.

Export Packing: Where Good Glass Goes to Die (If Done Wrong)

More glass dies in transit than in production. Panels ship in plywood or MDF crates with foam interleaves, V-groove or vertical racking per panel type, corner protection, and desiccant for ocean freight. Crates are engineered per panel family — tabletops rack differently from curtain wall units — and every crate is marked with contents and orientation. Freight terms are flexible: FOB, CIF or door delivery via our forwarders, or your own.

Crated auto glass: V-blocks, edge guards and strapping over a shock-absorbing base.
Crated auto glass: V-blocks, edge guards and strapping over a shock-absorbing base.
Container-ready solar glass: paper interleaving and a moisture barrier for ocean freight.
Container-ready solar glass: paper interleaving and a moisture barrier for ocean freight.

The Honest Timeline

Standard processed panels: 10-15 days after drawing approval. Complex laminated or IGU builds: 15-25 days. Custom molds (curved glass) or first-time builds with sampling: add 1-2 weeks. Ocean transit varies by destination — we quote production and transit separately so project schedules stay honest. Start a conversation via our contact page and you'll have a firm, itemized quote — not a range — within one working day.

The RFQ Field Checklist, With Examples

Every field below either shortens the quotation or prevents a change order. Copy it into your email template once and every future RFQ prices faster — and flag which fields are flexible, because that is where the factory can trade cost for you.

FieldWhy it mattersExample entry
Glass build-upSets base material and line cost6 mm clear tempered, or 6 + 1.52 PVB + 6 laminated
Sizes and quantitiesDrives sheet yield and machine setup1200 x 2000 mm, 80 pcs
Edge treatmentPolish and bevel are real machine timeFlat polish all edges
Holes / notchesCNC time plus QC checks per hole4 holes Ø12 mm, 100 mm from corners
Heat treatment / heat-soakScheduling on the tempering lineTempered + heat-soaked
Coating / printingMaterial cost and color approval cycleLow-E on surface 3; white print per artwork A
Destination portFreight mode and packing designJebel Ali, CIF

Incoterms Without the Jargon Headache

Freight terms decide who books what and where risk transfers — worth two minutes of clarity before the order, not after the container sails. They also interact with packing: a door-delivery shipment rides more handling steps than an EXW collection, so crates are engineered accordingly.

  • EXW: you collect from the factory; we hand over packed crates at the gate. Cheapest, all logistics on you.
  • FOB: we deliver to the vessel at the named Chinese port; ocean freight and insurance are yours.
  • CIF: we book freight and marine insurance to your port; risk still transfers on loading, so document condition at discharge.
  • Door delivery: our forwarders handle the chain to your warehouse — simplest for first-time importers, priced accordingly.
  • Insurance under CIF is typically 110% of invoice value; check the certificate matches the cargo before sailing.
💡

Before locking panel dimensions, ask for a sheet-yield optimization pass: shifting a run from 4-per-sheet to 6-per-sheet cutting can drop unit cost around 30% at identical performance. It is the single fastest saving in custom glass, and it costs one email.

Tolerances: What 'Good' Means in Numbers

Expectations should be numeric before production starts. Standard cutting tolerance on CNC-processed panels is around ±1 mm; thickness follows float glass production tolerances per EN 572-2; tempered panels show roller wave typically within 0.2-0.3 mm per 300 mm per EN 12150 practice; hole diameters run +0.5/−0 mm with positions ±1 mm. Coated glass adds color-position tolerances across batches — one more reason spares belong in the original production run rather than in a later reorder. Put the tolerance table into the drawing set and most disputes evaporate before they exist; the capabilities page lists what each line measures.

Receiving: Ten Minutes That Protect the Whole Order

  1. Count crates against the packing list before signing anything.
  2. Photograph every crate, especially crush points, before opening.
  3. Open one crate per position on the manifest first — spot-check before unloading everything.
  4. Check panels against the packing photos we provide pre-shipment.
  5. Document any damage with photos of the crate and panel together, same frame if possible.
  6. File claims within the insurance window — transit claims age badly, and so does their paperwork.

Frequently Asked Questions

What information do you need for an accurate quote?

Glass build-up, panel sizes and quantities, edge treatment, holes/notches, any printing or coatings, heat treatment, and destination port. A simple spreadsheet or drawing set works — we return firm pricing within 24 hours.

Is there a minimum order?

No hard minimum — a single crate is viable. Per-unit cost improves at volume because setup and freight amortize; we quote honestly at both ends of the scale.

Can I order samples before committing?

Yes — we supply physical samples of the exact build-up, including printed or etched versions of your artwork. Request samples with your project details.

How is the glass packed for ocean freight?

Plywood crates with foam interleaves or vertical racking per panel type, corner protection and desiccant. Crates are marked with contents and orientation, and packing photos are available before shipping.

What happens if a panel arrives damaged?

Document with photos on receipt; transit insurance (ours or yours, per freight terms) covers replacement, and we reproduce panels quickly since drawings and production data are on file.

What are the payment terms?

Standard terms are 30% deposit with order and balance against shipping documents; established accounts move to net terms. Letters of credit are accepted on larger projects — agree it at quotation stage so documents match from day one.

Can I reorder the same panels a year later?

Yes — drawings, tooling and production recipes stay on file against your project code. Reorders skip engineering and sampling and run on the shortest lead time, with one caveat: coating batches can vary slightly, so order spares for visibly exposed panels with the original run.

Is sampling charged, and is it refunded?

Sampling carries a cost covering exact-build-up production, typically credited against the production order when it proceeds. For large projects, a physical sample is the cheapest insurance available — request it at quotation stage, not after the PO.

How accurate are the quoted lead times?

They are production windows, quoted separately from transit so the schedule stays honest: standard processed panels 10-15 days after drawing approval, complex laminated or IGU builds 15-25 days, custom molds or first-time builds with sampling add 1-2 weeks. Milestone updates go out at cutting, heat treatment and packing.

The Bottom Line

Send your drawings or panel schedule — you will receive an itemized quote with packing and freight options within 24 hours.